DIYCraft logoDIYCraft

Shed foundation guide

Adjustable metal base

Metal leveling feet support a compatible raised shed floor.

By DIYCraft · Updated October 24, 2026

Build it step by step
Three-dimensional adjustable metal base assembly with surrounding lawn and a ground cutaway

This guide covers metal feet that sit on prepared pads. Installed ground screws are a different foundation. Check the product load and height limits, keep the plates fully supported, and anchor the shed.

Is it right for your shed?

Best fit: A compatible raised floor needing a small height adjustment.

Advantages

  • Threaded heads allow fine leveling.
  • Rated heads can connect to beams.
  • Supports stay visible for checks.

Limitations

  • Metal needs suitable rust protection.
  • Tall extensions may be unstable.
  • Surface plates do not reach deep bearing ground.

Ground layers

Adjustable metal base: cutaway showing prepared soil, stone base and support pad, steel base plate, threaded support and lock, beam bracket and frame, with grass outside the prepared base.
The ground layers and supports, seen from the side. Open full-size section ↗

Read these layers from the ground up.

  1. 1

    Prepared soil

    Prepare firm soil.

  2. 2

    Stone base and support pad

    Compact the base and set a full bearing pad.

  3. 3

    Steel base plate

    Set and fasten the plate.

  4. 4

    Threaded support and lock

    Adjust and lock the threaded head.

  5. 5

    Beam bracket and frame

    Fasten the beam and frame.

What you need

Get quantities and sizes from your shed plan.

  • Metal supports and locks approved for the shed
  • Firm bearing pads
  • Matching frame, fasteners, bracing
  • Rated driven earth-anchor and cable kit, including its specified terminations and timber edge protection

Useful planning: choose the shed location and check permit requirements.

Build it step by step

  1. Step 1: Check the support type

    Confirm these are surface supports approved for the shed and planned height. Read the load, fixing and adjustment limits for the exact product. Mark ground-anchor locations and locate buried services before digging.

    Adjustable metal base, step 1: Check the support head and timber fit.
    Check the support head and timber fit.
  2. Step 2: Prepare bearing pads

    Mark positions under the floor beams. Prepare firm, level pads with full plate support.

    Adjustable metal base, step 2: Prepare firm, level pads beneath the support plates.
    Prepare firm, level pads beneath the support plates.
  3. Step 3: Fit plates and heads

    Fit the plates and heads using the specified fasteners. Check that every connection is secure.

    Adjustable metal base, step 3: Set the support plates and heads in position.
    Set the support plates and heads in position.
  4. Step 4: Level and lock the frame

    Level the frame within the allowed range and tighten the locks. Check the full floor for twist.

    Adjustable metal base, step 4: Level the floor frame and lock the adjustments.
    Level the floor frame and lock the adjustments.
  5. Step 5: Anchor the leveled frame

    With the heads connected and the adjustment locked, secure the structural timber to independent ground anchors. Complete the specified bracing before laying the floor deck.

    Timber bearer on a locked adjustable metal foot with a separate cable loop and buried earth anchor
    The metal foot rests on a stable pad. The cable joins the timber to an independent ground anchor; the adjustment stem is not a ground screw.
    1. Drive the anchor beside the support to the kit's specified soil depth. Remove the drive rod, then pull the cable to turn and set the buried head. Complete the manufacturer's required setting or pull test.
    2. Route the cable around the structural timber at the planned fixing point. Fit the kit's cable termination and edge protection as instructed; keep the loop clear of joist connections and access routes.
    3. Take up slack and secure the cable as the kit directs, without lifting or twisting the timber off the metal feet. Check all bearings and keep the connection accessible for inspection.

    Anchoring is recommended and is required where the shed instructions or local rules specify it. Use a rated anchor and cable kit matched to the soil, raised-frame height and shed loads.

Mistakes to avoid

  • Calling a surface foot a ground screw.
  • Extending threads past the product limit.
  • Assuming a beam saddle anchors the whole shed.

Keep it in good shape

Check for rust, loose fasteners, unlocked threads and moving pads. Support the floor safely before adjusting a loaded foot.

When to choose a different base

Use metal feet for small, controlled leveling. Use designed piers or installed ground screws when deeper support is needed.

Common questions

Are ground screws covered by this guide?

No. This guide shows surface feet. Installed ground screws need their own site and product plan.

Can a jack support a tall post?

Only if the complete support system allows that height and includes the needed bracing.

Is anchoring optional for this foundation?

Anchoring is recommended and is required whenever the shed instructions, foundation design or local rules specify it. The illustrated method must be matched to the actual shed and site.

Could screw anchors with L brackets be used instead?

Only if a specified system connects at the timber height while retaining its required soil embedment and capacity. A short screw left partly above ground to reach a raised beam is not an equivalent connection.

Further reading