Shed foundation guide

Deck block foundation

Shaped concrete or fixed polymer blocks support compatible shed framing on prepared ground.

By DIYCraft · Updated October 24, 2026

Build it step by step
Three-dimensional deck block foundation assembly with surrounding lawn and a ground cutaway

Deck blocks have shaped seats for compatible timber bearers. This guide follows concrete blocks on prepared pads, with a separate cable-and-ground-anchor connection. Use a block product and support layout suited to the shed loads.

Is it right for your shed?

Best fit: A low, light shed when the chosen blocks are approved for it.

Advantages

  • Shaped seats help locate matching beams.
  • No site concrete pour is needed.
  • Individual supports are easy to inspect.

Limitations

  • Blocks may settle unevenly.
  • Seat sizes and uses vary by product.
  • Tall posts need a separate stability design.

Ground layers

Deck block foundation: cutaway showing firm soil, compacted pad, shaped support block (concrete shown), matching floor beam, floor framing, with grass outside the prepared base.
The ground layers and supports, seen from the side. Open full-size section ↗

Read these layers from the ground up.

  1. 1

    Firm soil

    Remove grass and soft soil.

  2. 2

    Compacted pad

    Compact a pad below each block.

  3. 3

    Shaped support block (concrete shown)

    Set the block flat and facing the right way.

  4. 4

    Matching floor beam

    Place a beam that fits its seat.

  5. 5

    Floor framing

    Connect the floor and install anchors.

What you need

Get quantities and sizes from your shed plan.

  • Deck blocks approved for the shed
  • Material for firm bearing pads
  • Matching beams, connectors
  • Rated driven earth-anchor and cable kit, including its specified terminations and timber edge protection

Useful planning: choose the shed location and check permit requirements.

Build it step by step

  1. Step 1: Check the block product

    Check that the exact concrete or polymer block is suitable for the shed, timber size, loads and planned height. Make sure the timber fits the shaped seat without rocking. Do not copy a deck-only spacing chart for a loaded shed. Mark ground-anchor locations and locate buried services before digging.

    Deck block foundation, step 1: Check that the timber fits the block seat.
    Check that the timber fits the block seat.
  2. Step 2: Mark support points

    Mark block positions under the floor beams. Check the layout for square.

    Deck block foundation, step 2: Measure and mark the block positions in rows.
    Measure and mark the block positions in rows.
  3. Step 3: Prepare pads and set blocks

    Prepare a firm pad under each block. Set each block level with its full base supported.

    Deck block foundation, step 3: Set each deck block level on a firm pad.
    Set each deck block level on a firm pad.
  4. Step 4: Set and level the bearers

    Seat the timber bearers fully on the supports and check their tops are level. Keep the anchor fixing points accessible before adding floor joists.

    Timber bearers seated and leveled on the prepared blocks before anchoring and floor framing.
    Timber bearers seated and leveled on the prepared blocks before anchoring and floor framing.
  5. Step 5: Anchor the bearers and complete the floor

    Connect the bearers to the ground anchors as shown. Once the connections are checked, build and fasten the floor frame to the anchored timber and complete the specified bracing.

    Timber bearer seated in a concrete deck block with an independent cable loop and buried earth anchor
    The shaped seat supports the bearer. The separate ground anchor and protected cable loop hold the timber down, independently of the loose deck block.
    1. Drive the anchor beside the support to the kit's specified soil depth. Remove the drive rod, then pull the cable to turn and set the buried head. Complete the manufacturer's required setting or pull test.
    2. Route the cable around the structural timber at the planned fixing point. Fit the kit's cable termination and edge protection as instructed; keep the loop clear of joist connections and access routes.
    3. Take up slack and secure the cable as the kit directs, without lifting or twisting the timber off the deck blocks. Check all bearings and keep the connection accessible for inspection.

    Anchoring is recommended and is required where the shed instructions or local rules specify it. Use a rated anchor and cable kit matched to the soil, raised-frame height and shed loads.

Mistakes to avoid

  • Treating the seat as a wind anchor.
  • Using tall unbraced posts.
  • Mixing blocks with different heights or ratings.

Keep it in good shape

Check for rocking, cracks and sinking after rain. Clear debris from timber seats.

When to choose a different base

Use deck blocks only when their seats and load limits match the floor. Use piers for a designed deeper support.

Common questions

Can deck blocks sit on pavers?

Only when the product and floor plan allow the full stack, including the paving below.

Do deck blocks need anchors?

The shed needs a suitable anchoring arrangement wherever its design, manufacturer or local rules require it, and we recommend anchoring. A concrete or polymer block does not automatically provide it. Use separate rated ground anchors unless the complete support system supplies the required restraint.

Is anchoring optional for this foundation?

Anchoring is recommended and is required whenever the shed instructions, foundation design or local rules specify it. The illustrated method must be matched to the actual shed and site.

Can I use fixed polymer blocks instead?

Yes, if the exact product is approved for the shed, loads and timber size. Follow its support layout and height limits. Fixed polymer blocks still need a suitable shed anchoring arrangement.

Could screw anchors with L brackets be used instead?

Only if a specified system connects at the timber height while retaining its required soil embedment and capacity. A short screw left partly above ground to reach a raised beam is not an equivalent connection.