Plastic feet can fine-tune the height of a floor frame. They need firm bearing pads and a product approved for the shed. They do not fix soft ground or anchor the shed.
Is it right for your shed?
Best fit: A light shed with a floor and plastic support system designed to work together.
Advantages
- Height can be fine-tuned.
- Parts are light to carry.
- The floor can sit above wet ground.
Limitations
- Feet can sink on weak pads.
- Height and load limits vary by product.
- The frame still needs bracing and anchors.
Ground layers

Read these layers from the ground up.
- 1
Firm ground
Prepare firm ground at each support.
- 2
Prepared support pad
Make pads that spread the load.
- 3
Foot base
Set each base flat.
- 4
Adjustable stem and head
Adjust and lock the head within its range.
- 5
Frame and fixings
Fasten the frame and fit anchors.
What you need
Get quantities and sizes from your shed plan.
- Plastic feet approved for the shed
- Bearing pads specified by the maker
- Matching frame, fixings
- Rated driven earth-anchor and cable kit, including its specified terminations and timber edge protection
Useful planning: choose the shed location and check permit requirements.
Build it step by step
Step 1: Check the feet and floor
Check that the feet are approved for the shed floor and its loaded weight. Read the allowed height range and the way the frame fastens to each head. Mark ground-anchor locations and locate buried services before digging.

Check how the timber fits on the adjustable foot. Step 2: Prepare bearing pads
Mark each foot from the floor plan. Prepare a firm bearing pad at every mark and check that the pads are level.

Prepare a firm, level pad for each foot. Step 3: Set the feet
Set each foot within its allowed height range. Use only approved parts on sloping pads.

Set each adjustable foot on its pad. Step 4: Connect and level the frame
Connect the floor frame, level it and lock the feet as directed. Check contact at every head.

Fit the floor frame and adjust the feet until it is level. Step 5: Anchor the leveled frame
After leveling and locking the feet, secure the structural timber to independent ground anchors. Keep the specified frame bracing and leave the connections accessible before laying the floor deck.

The foot levels and supports the bearer. The ground-anchor cable connects to the timber, clear of the plastic head and bearing pad. - Drive the anchor beside the support to the kit's specified soil depth. Remove the drive rod, then pull the cable to turn and set the buried head. Complete the manufacturer's required setting or pull test.
- Route the cable around the structural timber at the planned fixing point. Fit the kit's cable termination and edge protection as instructed; keep the loop clear of joist connections and access routes.
- Take up slack and secure the cable as the kit directs, without lifting or twisting the timber off the plastic feet. Check all bearings and keep the connection accessible for inspection.
Anchoring is recommended and is required where the shed instructions or local rules specify it. Use a rated anchor and cable kit matched to the soil, raised-frame height and shed loads.
Mistakes to avoid
- Using roof-paving feet without shed approval.
- Extending feet beyond their limit.
- Using adjustment to hide moving ground.
Keep it in good shape
Check locks, cracks, head contact and sinking pads. Fix the ground cause if the floor needs repeated leveling.
When to choose a different base
Use plastic feet when the whole system is approved for the shed. Choose piers when you need much more height.
Common questions
Can I put the feet on soil?
Only if the product allows that exact soil and bearing setup. Many feet need firm pads.
Are plastic feet waterproof?
The foot can resist water, but it does not waterproof the shed floor.
Is anchoring optional for this foundation?
Anchoring is recommended and is required whenever the shed instructions, foundation design or local rules specify it. The illustrated method must be matched to the actual shed and site.
Could screw anchors with L brackets be used instead?
Only if a specified system connects at the timber height while retaining its required soil embedment and capacity. A short screw left partly above ground to reach a raised beam is not an equivalent connection.
Further reading
- ICC: 2024 IRC, Chapter 4 — Foundations
Ground support and frost protection.
- American Earth Anchors: shed anchor installation
Cabled-anchor connections, installation and setting the anchor in the soil.
- Simpson Strong-Tie: connector holes and fastener types
Use the connector's specified fastener type, size and installation pattern.
- American Wood Council: sill-plate anchorage and the continuous load path
Connect the structure all the way to its foundation; the weakest connection matters.

