DIYCraft logoDIYCraft

Shed foundation guide

Concrete block foundation

Solid blocks hold a shed floor above prepared ground.

By DIYCraft · Updated October 24, 2026

Build it step by step
Three-dimensional concrete block foundation assembly with surrounding lawn and a ground cutaway

Blocks can support a low timber floor without a concrete pour. Put them under the floor beams where the floor plan calls for support. Each block needs firm ground below it, and the shed needs its own anchors.

Is it right for your shed?

Best fit: A light shed with a suitable timber floor on level ground.

Advantages

  • Blocks are easy to move into place.
  • No concrete pour is needed.
  • Supports stay visible for checks.

Limitations

  • Blocks can sink at different rates.
  • They need a floor designed for point supports.
  • Blocks do not anchor the shed.

Ground layers

Concrete block foundation: cutaway showing firm soil, prepared support pad, solid concrete block, beam and floor frame, with grass outside the prepared base.
The ground layers and supports, seen from the side. Open full-size section ↗

Read these layers from the ground up.

  1. 1

    Firm soil

    Remove grass and reach firm soil.

  2. 2

    Prepared support pad

    Make a stable, level pad for each block.

  3. 3

    Solid concrete block

    Set each solid block fully on its pad.

  4. 4

    Beam and floor frame

    Set the beams and floor on the planned support points.

What you need

Get quantities and sizes from your shed plan.

  • Solid bearing blocks
  • Material for firm, level pads
  • Floor beams, connectors
  • Rated driven earth-anchor and cable kit, including its specified terminations and timber edge protection

Useful planning: choose the shed location and check permit requirements.

Build it step by step

  1. Step 1: Mark block positions

    Use the floor plan to mark beam lines and block positions. Check the loaded floor and support spacing. Mark ground-anchor locations and locate buried services before digging.

    Concrete block foundation, step 1: Mark the rows where the floor beams and blocks will sit.
    Mark the rows where the floor beams and blocks will sit.
  2. Step 2: Prepare each spot

    Remove grass and soft soil at every block. Prepare a firm, level bearing area.

    Concrete block foundation, step 2: Clear grass and soft soil from the support area.
    Clear grass and soft soil from the support area.
  3. Step 3: Set the blocks

    Set solid blocks low, level and fully supported. Do not stack loose blocks to gain height.

    Concrete block foundation, step 3: Set each solid block level on a firm pad.
    Set each solid block level on a firm pad.
  4. Step 4: Set and level the bearers

    Seat the timber bearers fully on the supports and check their tops are level. Keep the anchor fixing points accessible before adding floor joists.

    Timber bearers seated and leveled on the prepared blocks before anchoring and floor framing.
    Timber bearers seated and leveled on the prepared blocks before anchoring and floor framing.
  5. Step 5: Anchor the bearers and complete the floor

    Connect the bearers to the ground anchors as shown. Once the connections are checked, build and fasten the floor frame to the anchored timber and complete the specified bracing.

    Timber bearer on a solid concrete block with a cable loop connected to a set earth anchor beside the block
    The block carries the weight. A protected cable loop connects the timber to the set anchor below ground. The cutaway exposes one connection; use the kit's depth, cable terminations and fixing layout.
    1. Drive the anchor beside the support to the kit's specified soil depth. Remove the drive rod, then pull the cable to turn and set the buried head. Complete the manufacturer's required setting or pull test.
    2. Route the cable around the structural timber at the planned fixing point. Fit the kit's cable termination and edge protection as instructed; keep the loop clear of joist connections and access routes.
    3. Take up slack and secure the cable as the kit directs, without lifting or twisting the timber off the blocks. Check all bearings and keep the connection accessible for inspection.

    Anchoring is recommended and is required where the shed instructions or local rules specify it. Use a rated anchor and cable kit matched to the soil, raised-frame height and shed loads.

Mistakes to avoid

  • Setting blocks on grass.
  • Stacking loose blocks to gain height.
  • Placing blocks by guesswork instead of the floor plan.

Keep it in good shape

Check for cracked, tilted or sinking blocks after wet weather. Fix the ground below a moving block before resetting it.

When to choose a different base

Use blocks for a low, light shed with a floor designed for point supports. Use piers when the site needs deeper supports.

Common questions

Are solid blocks and deck blocks the same?

No. A solid block has a flat top; a deck block has a shaped seat. Check which one your floor uses.

How many blocks does a shed need?

Use the number and positions in the floor plan. Beam spans and loads decide the layout.

Is anchoring optional for this foundation?

Anchoring is recommended and is required whenever the shed instructions, foundation design or local rules specify it. The illustrated method must be matched to the actual shed and site.

Could screw anchors with L brackets be used instead?

Only if a specified system connects at the timber height while retaining its required soil embedment and capacity. A short screw left partly above ground to reach a raised beam is not an equivalent connection.

Further reading